VMware to Hyper-V Migration Case Study: What It’s Really Like
At a glance
On this page
- 01 Quick answer – VMware to Hyper-V migration case study
- 02 What to know first
- 03 Where these projects started
- 04 Three migrations side by side
- 05 Case 1: Reuse what makes sense
- 06 Case 2: Keep the SAN
- 07 Case 3: A different architecture
- 08 Pilot first, protect backups
- 09 What didn’t go to plan
- 10 When to stay on VMware
- 11 How long it really takes
- 12 Which migration tool to use
- 13 Our delivery model
- 14 Migration readiness checklist
- 15 Frequently asked questions
QUICK ANSWER
The Practical Starting Point: VMware to Hyper-V Migration Case Study
Moving off VMware is easy to talk about. This VMware to Hyper-V migration case study shows what it actually looks like.
Over the past couple of years, Intellect IT has planned and delivered VMware to Hyper-V migrations for Australian organisations in logistics, retail and other sectors.
Rather than focus on one customer, we’ve brought together real examples from several of those projects.
The biggest lesson is simple. Converting the virtual machines is only a small part of the job. The work around it is where experience counts.
Client names have been withheld for confidentiality. The examples are drawn from real Intellect IT projects.
Key takeaways
Reuse what still makes sense
A new hypervisor doesn't automatically mean new servers or a new SAN. Check what can stay first.
Plan migration storage, not just the end state
You need temporary space to move workloads across. It's one of the easiest things to overlook.
Ten VMs aren't ten identical jobs
One large application server can need more planning than several small VMs combined.
Pilot before the critical systems
Measure real migration speed on lower risk servers before you lock in outage windows.
Backups move last
Keep the old VMware protection until the new Hyper-V backups are proven to work.
Start six months out
Time gives you options. A looming renewal takes them away.
How these migrations ran
A real VMware to Hyper-V migration, step by step
Every project followed the same shape. Understand the environment, prove the approach on low risk servers, then move the critical systems with a way back.
Discover
Design and build
Pilot migration
Migrate in groups
Validate and retire
Where these VMware to Hyper-V migrations started
The reasons for looking at a move varied.
For a large Australian retailer, VMware end of support was the trigger to review the platform rather than simply carry on. The business moved to Windows Server 2025 Hyper-V and kept its existing shared SAN.
For a national Australian business, the VMware renewal date became the project deadline. The opportunity was to reuse the existing servers and SAN, but only after confirming the hardware, storage and Windows Server licensing supported the new design.
That’s why we recommend starting around six months before your renewal. The question isn’t just “Can we replace VMware with Hyper-V?” It’s “If we were designing this environment today, what would we build?”
Why it matters
“A successful migration isn’t one where nothing unexpected happens. It’s one where you’ve already thought about what you’ll do when it does.”
Max Soukhomlinov Intellect IT Director
New to the series? Start with whether to move from VMware to Hyper-V, our Hyper-V vs VMware comparison, and Windows Server Standard vs Datacenter.
VMware to Hyper-V migration case study: three projects side by side
Here’s how three of these migrations compared.
| Case 1: National business | Case 2: Large retailer | Case 3: National logistics | |
|---|---|---|---|
| Organisation | A national Australian business | A large Australian retailer | A national logistics organisation |
| Trigger | VMware renewal date became the project deadline | VMware end of support | Platform review and modernisation |
| New platform | Hyper-V on the existing servers | Windows Server 2025 Hyper-V, two-node failover cluster | Windows Server 2025 Hyper-V, two-node failover cluster |
| Storage | Existing iSCSI SAN reused | Existing SAN kept as Cluster Shared Volumes | Storage Spaces Direct, plus existing SAN where it made sense |
| Migration style | Progressive, group by group | Converted and migrated, then VMware retired | Workload by workload, each with its own method |
| Main challenge | Not enough free SAN space for a second copy of about 8.6 TB | Moving backups and monitoring at the right time | Very different workloads, from RDS to a large file server |
| Key lesson | Plan temporary migration storage | Keep what still works | Plan workload by workload, not VM by VM |
Case 1: Reuse what makes sense
A national Australian business had a VMware environment running on hardware that still had useful life. Replacing everything just because the hypervisor was changing didn’t make commercial sense.
The plan was to reuse the existing servers and iSCSI SAN, build the Hyper-V environment and migrate workloads progressively.
It wasn’t quite that simple. The SAN didn’t have enough free space to hold a full second copy of about 8.6 TB of workloads.
So instead of buying a bigger SAN, we changed the approach. Each group of VMs was migrated, checked on Hyper-V, and only then was the old VMware copy retired and its storage reclaimed for the next group.
Planning also found a single VM bigger than the 5 TB of migration space available. Finding that early meant there was time to clean up data and choose another approach, rather than discovering it on the night.
- The business benefit: The client could keep infrastructure it had already paid for, instead of funding a full hardware replacement.
- The lesson: Check storage for the migration itself, not just the finished environment. Temporary space is easy to overlook.
Case 2: Sometimes keeping the SAN is the right answer
For a large Australian retailer, there was no reason to replace perfectly good shared storage just because VMware was going.
We deployed Windows Server 2025 Hyper-V across two nodes, set up Windows Failover Clustering and connected the existing SAN as Cluster Shared Volume storage.
Workloads were converted and migrated. Only then were the VMware backups and monitoring retired.
- The business benefit: High availability stayed in place, and the platform changed without replacing everything underneath it.
- The lesson: A VMware to Hyper-V migration doesn’t have to become a full data centre replacement. Keep what still makes sense. Replace what doesn’t.
Case 3: Sometimes it’s a different architecture
A national logistics organisation needed something different again. Workloads moved to a two-node Windows Server 2025 Hyper-V failover cluster, using Storage Spaces Direct alongside existing SAN storage where it made sense. Backup and monitoring moved across as part of the project.
This project showed why a migration is planned workload by workload, not just VM by VM.
- Some servers: Migrated directly.
- Older systems: Replaced side by side on newer operating systems.
- Remote Desktop servers: Moved in batches after a pilot and user testing.
- A large file server: Needed its own outage window of several hours, because of its size and testing.
- Database and application servers: Each needed its own approach.
The project also uncovered a chance to improve security. Rather than leave workstations, Remote Desktop and backend servers together, the new design separated user facing systems from backend infrastructure, with firewall controls between them. Doing it during the migration was far less work than coming back later and moving everything again.
- The business benefit: Each system moved in the way that best balanced risk, downtime and business impact.
- The lesson: Ten VMs don’t mean ten similar migrations. And a migration is the best time to fix what you’d otherwise live with for years.
Pilot first, and protect your backups
One rule runs through every VMware to Hyper-V migration we do: don’t make your most important server the first one you move.
On one project, lower risk VMs were used to measure real migration speed before the final after-hours windows were locked in. Until you test it, you don’t know how fast your particular mix of storage, network and tools will move the data.
A national professional membership organisation took the same careful approach. VMware and Hyper-V ran side by side, systems moved in stages, and the original VMware VMs stayed as a way back until the new ones were tested.
Backups need their own plan
A server starting up on Hyper-V isn’t enough. It has to be protected.
- Reconfigure: Point backup services at the new Hyper-V workloads.
- Validate: Confirm backup jobs and replication are actually succeeding.
- Update monitoring: Make sure alerts cover the new platform.
- Only then retire: Remove the VMware protection last, never first.
It isn’t exciting. But it’s exactly the detail you want someone thinking about when they’re moving your production systems.
What didn’t go to plan in our VMware to Hyper-V migrations
Real environments aren’t clean. They’ve grown over years. Across different projects, we’ve run into:
- Very large VMs: Some didn’t fit in the migration storage first available.
- Older operating systems: These needed a different migration approach.
- BIOS and partition compatibility: Some VMs needed extra checks before they could move.
- Application reactivation: Some software needed reactivating once the virtual hardware changed.
- Printer configurations: These had to be documented before any server changes.
- Storage limits: These changed the order workloads were moved in.
- Network segmentation: Cheaper to fix while servers were already moving.
- Backup and DR timing: These had to move at exactly the right point.
None of these made a migration unworkable. They just needed finding before they became surprises.
And sometimes the answer is to stay on VMware
Hyper-V isn’t automatically the right answer, and our projects prove it.
For a transport organisation, we’ve delivered and supported a stretched VMware vSAN design across two data centres, with large storage, automatic failover, substantial backup infrastructure and complex disaster recovery needs.
That’s a very different environment from a typical two-host setup, and VMware was the right fit.
Because we work with both platforms, we don’t start with “How do we get you onto Hyper-V?” We start with “Which platform actually makes sense for you?”
How long does a VMware to Hyper-V migration take?
There’s no honest answer based only on the number of VMs.
A simple environment with supported operating systems and compatible hardware can move fairly quickly. Others involve new hardware, large data volumes, application owners, operating system upgrades, vendors and tight outage windows.
- Smaller workloads: Planned outages of around one to two hours.
- Larger systems: Four to seven hours, including migration and testing.
- The whole project: Depends on how much discovery, building and testing your environment needs.
In one recent production migration, several critical workloads moved from VMware to Hyper-V within the approved maintenance window, faster than planned. The team took backups first, checked storage, moved workloads in stages, validated each one and monitored all weekend. Afterwards the environment was stable, the cluster was healthy and backups were completing.
Having a Plan B mattered too. It gave the client flexibility around the final cutover and the timing of their licensing.
Start around six months before renewal
That doesn’t mean a VMware to Hyper-V migration takes six months. It means there’s time to find the things nobody knew about, before the deadline forces your hand.
Which VMware to Hyper-V migration tool should you use?
We’re often asked which tool to use. The tool matters less than the planning around it, but it does change how much downtime you need.
Here are the main options for a VMware to Hyper-V migration and where each one fits.
| Tool | Best for | Cost | Downtime |
|---|---|---|---|
| Windows Admin Center VM Conversion | Small to medium environments managed through vCenter, up to 10 VMs per batch | Free | Minimal. VMs copy across while running, then shut down briefly for a final sync. Still in preview. |
| StarWind V2V Converter | Standalone ESXi hosts and one-off VMs | Free | Usually a shutdown per VM, though a sync option can reduce it. |
| Veeam Backup & Replication | Larger production workloads, especially if you already use Veeam | Paid | Very low. Instant Recovery can run a VMware backup straight onto a Hyper-V host. |
| System Center VMM | Businesses already running System Center | Paid | A full outage per VM. VMs must be powered off, and VMs on vSAN storage aren’t supported. |
Avoid Microsoft Virtual Machine Converter (MVMC) and Disk2VHD for production systems. MVMC has been retired and struggles with modern operating systems.
If you already run System Center, Microsoft’s guide to converting VMware VMs in VMM covers its limits, including powered-off conversions and no vSAN support.
A word on Windows Admin Center
Microsoft’s free Windows Admin Center VM Conversion extension is the one most people hear about first. It copies VMs while they keep running and only powers them off for a final sync at cutover.
It’s still in preview, so Microsoft doesn’t formally support it yet. It also works through vCenter and needs VMware PowerCLI and a specific VDDK version installed. Microsoft’s step-by-step migration guide lists the full requirements.
For a small environment that may be fine. For critical systems, it’s worth weighing up whether you want a supported tool behind you.
Technical checks before any VMware to Hyper-V migration
- Build the Hyper-V side first: Hosts, storage (Cluster Shared Volumes or SMB) and virtual switches that match your existing VLANs.
- BIOS or UEFI: BIOS VMs become Generation 1 Hyper-V VMs and UEFI VMs become Generation 2. Check each one.
- Static IPs: Record them before you start, as network adapters change during conversion.
- Passthrough hardware: Remove vGPU or SR-IOV devices, which won’t come across.
- Linux servers: Install Hyper-V drivers before migrating, or the VM may not boot.
- Clean up afterwards: Remove VMware Tools and check Hyper-V Integration Services are running.
These details sit behind the “what didn’t go to plan” list above. Getting them right during planning is what keeps cutover windows short.
How Intellect IT runs a VMware to Hyper-V migration
Phase 1 – Discovery and assessment
- Every workload: We record each VM, its size, operating system and dependencies.
- Hardware and storage: We check what can be reused, including migration headroom.
- The business: We agree outage windows and who owns each application.
Phase 2 – Architecture and licensing
- The right design: Reuse, keep the SAN, Storage Spaces Direct, or a mix.
- 3, 5 and 10 year TCO: We model Standard, Datacenter or a mix over the life of the hardware.
- Improvements: We look for things to retire, upgrade or separate while we’re there.
Phase 3 – Build and pilot
- Build: We set up the Hyper-V hosts, cluster, storage and networking.
- Pilot: We move lower risk VMs first and measure real transfer speeds.
- Adjust: We refine the schedule before any critical system moves.
Phase 4 – Migrate in controlled groups
- Staged moves: Production workloads move in groups, each with its own method.
- Validation: Each system is checked with the people who use it.
- A way back: The original VMware VMs stay until the new ones are proven.
Phase 5 – Protect, retire and hand over
- Backups and DR: New protection is validated before the old is removed.
- Retire VMware: Decommissioned cleanly once everything is stable.
- Handover: Documentation, monitoring and ongoing support.
The conversion technology isn’t the most important part of a VMware to Hyper-V migration. Knowing your environment well enough to move it safely is.
Interactive check
VMware to Hyper-V migration readiness checklist
Tap everything you already have in place. We’ll show how ready you are, and what to sort out next.
Select all that apply
Your migration readiness
Tap the items you have in place.
This is a directional check, not a full migration assessment.
Decision support
Which description sounds most like your business?
Select the one closest to where you are now.
Fast answers
Quick migration questions
Tap a question for a short, practical answer.
Which server should we move first?
Do we have to move everything at once?
Will our printers and applications keep working?
Can we improve our network while we migrate?
VMware renewal coming up?
If your renewal is within the next six months, now is the right time to start.
At Intellect IT, we review your environment, workloads, licensing, hardware and storage to see whether there’s a genuine case for moving.
If Hyper-V makes sense, we’ll show you what a VMware to Hyper-V migration would realistically involve. If staying on VMware is the better call, we’ll tell you that too.
QUESTIONS, ANSWERED
Frequently asked questions
How long does a VMware to Hyper-V migration take?
It depends on the environment, not just the number of VMs. Simple environments with supported operating systems and compatible hardware can move quickly. Projects with new hardware, large data volumes, older systems or tight outage windows take longer. We recommend starting around six months before your VMware renewal.
How much downtime does a VMware to Hyper-V migration need?
For individual workloads, planned outages in our projects have ranged from around one to two hours for smaller systems to four to seven hours for larger systems that need migrating and testing. Workloads are moved in groups, so the whole business is not down at once.
Can we keep our existing SAN when moving to Hyper-V?
Often, yes. In one project, an existing SAN was connected to a two-node Windows Server 2025 Hyper-V cluster as Cluster Shared Volume storage. The hardware, storage and licensing need checking first to confirm they suit the new design.
Do we need new servers to move from VMware to Hyper-V?
Not necessarily. Servers and storage with useful life left can often be reused. You do need enough temporary storage to run the migration, which is easy to overlook.
What usually goes wrong in a VMware to Hyper-V migration?
Common issues include very large VMs that do not fit in the available migration storage, older operating systems, BIOS and partition compatibility, applications that need reactivating, and backups that need moving at the right time. None of these stop a migration if they are found during planning.
Can we roll back to VMware if something goes wrong?
Yes, if it is planned. Keeping VMware and Hyper-V running side by side, and retaining the original VMware VMs until the new ones are tested, gives you a way back.
What happens to backups during the migration?
Backups need their own plan. Backup services are reconfigured for the Hyper-V workloads and validated, monitoring is updated, and only then is the VMware protection removed.
What tool is used for a VMware to Hyper-V migration?
Common options are Microsoft’s free Windows Admin Center VM Conversion extension, StarWind V2V Converter for standalone ESXi hosts, Veeam Backup & Replication for larger production workloads, and System Center Virtual Machine Manager for businesses already using System Center. The right choice depends on the size of the environment, the budget and how much downtime each workload can accept.
Is the Windows Admin Center VM Conversion tool free?
Yes. Microsoft’s VM Conversion extension for Windows Admin Center is free and migrates VMs from vCenter to Hyper-V with minimal downtime. It is still in preview, so Microsoft does not formally support it yet, which is worth weighing up for critical systems.
When should a business stay on VMware?
When the environment genuinely needs what VMware offers, such as a stretched vSAN design across two data centres with automatic failover and complex disaster recovery requirements. The right platform is the one that fits the environment.